No title
The purpose of this essay is to explore power lines from a legal point of view and investigate the limits of what is possible to build within the concession order as well as the utility easement. This essay explores minor deviations from concession and utility easement when constructing or reconstructing a powerline. A literature study has been conducted alongside semi-structured interviews. To ge
