No title
The work studied the concept of introducing electrolyzer waste heat in between the district heating condensers to study the effects. This was done through IPSEpro where a model of a small-scale Swedish CHP-station was built. Two different cases were analyzed, where one CHP-station was analyzed as an existing (i.e., a fixed geometry) station and the other as a future potential station with external
