Fördjupad insatsplanering för nivå 775, Kirunagruvan
Working out an advanced operational plan for the 775-level of the Kiruna mine, using CFD-simulations and calculations. The advanced operational plan includes for example instructions on how to control the ventilation depending on where the fire is located. The report also investigates different, proposed fire protection measures for the level.