Search results

Filter

Filetype

Your search for "2024" yielded 22887 hits

Head of Department Letter December 2024

My first yearI will soon have been Head of the Department of Physics for a full year and it has been an exciting year! Both for the department and for myself in my new role.  Reading my first Head of Department letter from the beginning of the year, I realise that at the time I naively thought I would know what the job of Head of Department was like after a year. I've been through the annual cycle

https://www.fysik.lu.se/en/about-us/head-department-letter/head-department-letter-2024/head-department-letter-december-2024 - 2026-10-23

2024: upgrade information

The 7T facility is now fully open for research. Contact us for further information about the contents of the upgrade, impacts on your project or discussion of new project ideas! HistoryInstallation period: 29 July - 15 August - The installation started on schedule and was finished in a little under three weeks. This included work on the electric installations and all backups of previous scanner co

https://www.lbic.lu.se/explore-our-infrastructure/national-7t-facility/equipment/2024-upgrade-information - 2026-10-23

COSB60 Literature List 2024.9.16

COSB60 Literature List Agov, Avram. (2016). “Inter-Korean Relations, 1945–2013." In Michael Seth, ed. Routledge Handbook of Modern Korean History, Routledge, pp.368-389. > Pages to read for students: 22 Armstrong, Charles K. (2009). “Socialism, Sovereignty, and the North Korean Exception.” In Sonia Ryang, ed. North Korea: Toward a Better Understanding. Lexington Books, pp.41-55. > Pages to read fo

https://www.ace.lu.se/sites/ace.lu.se/files/2024-09/COSB60_Literature%20List_2024.9.16.pdf - 2026-10-21

Kalkyl Ansökan 2024 CEC Eng 1

Calculation - estimating the costs of a project Guidance 1/30/23 Guidance "Full cost estimate for funding application" is to be enclosed with the application. It is not compulsory to use this calculation, which is intended to provide support in estimating the costs of a project. General information about the calculation - The formulas in the calculation are not protected. - The starting year can b

https://www.cec.lu.se/sites/cec.lu.se/files/2024-02/Kalkyl%20ans%C3%B6kan%202024%20CEC%20eng%201.xlsx - 2026-10-21

Kalkyl Ansökan 2024 CEC Eng

Calculation - estimating the costs of a project Guidance 1/30/23 Guidance "Full cost estimate for funding application" is to be enclosed with the application. It is not compulsory to use this calculation, which is intended to provide support in estimating the costs of a project. General information about the calculation - The formulas in the calculation are not protected. - The starting year can b

https://www.cec.lu.se/sites/cec.lu.se/files/2024-02/Kalkyl%20ans%C3%B6kan%202024%20CEC%20eng.xlsx - 2026-10-21

CEC 2024-03 Kalkyl Eng

Calculation - estimating the costs of a project Guidance 1/30/23 Guidance "Full cost estimate for funding application" is to be enclosed with the application. It is not compulsory to use this calculation, which is intended to provide support in estimating the costs of a project. General information about the calculation - The formulas in the calculation are not protected. - The starting year can b

https://www.cec.lu.se/sites/cec.lu.se/files/2024-03/CEC%202024-03%20Kalkyl%20eng.xlsx - 2026-10-21